<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Shannon Construction</title>
	<atom:link href="http://shannon1.com/feed" rel="self" type="application/rss+xml" />
	<link>http://shannon1.com</link>
	<description>A foundation built on a family legacy... Old world knowledge applied with new world tools...</description>
	<lastBuildDate>Tue, 05 Jul 2011 22:04:35 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.1</generator>
		<item>
		<title>Cranberry Mall Facade</title>
		<link>http://shannon1.com/projects/cranberry-mall-facade.php</link>
		<comments>http://shannon1.com/projects/cranberry-mall-facade.php#comments</comments>
		<pubDate>Thu, 08 Oct 2009 18:15:06 +0000</pubDate>
		<dc:creator>Shannon Construction</dc:creator>
				<category><![CDATA[All Projects]]></category>
		<category><![CDATA[Development]]></category>

		<guid isPermaLink="false">http://shannon1.com/beta/?p=457</guid>
		<description><![CDATA[Communication was the key factor of this successful exterior renovation of the half mile strip mall in Cranberry Township, PA. The scope of work consisted of removal of the existing façade and a new E.F.I.S. façade was installed.  New brickwork, concrete sidewalks and pavers were design to the malls appearance.  New steel towers were erected [...]]]></description>
			<content:encoded><![CDATA[<p>Communication was the key factor of this successful exterior renovation of the half mile strip mall in Cranberry Township, PA.</p>
<p>The scope of work consisted of removal of the existing façade and a new E.F.I.S. façade was installed.  New brickwork, concrete sidewalks and pavers were design to the malls appearance.  New steel towers were erected and new light fixtures installed to illuminate the towers and the façade canopies.</p>
<p>The popular tenant strip mall remained open with constant traffic. Prior to the start of each construction phase, traffic patterns were carefully designed to relieve any stress the consumers would encounter shopping at the mall.</p>
<p><br class="spacer_" /></p>
]]></content:encoded>
			<wfw:commentRss>http://shannon1.com/projects/cranberry-mall-facade.php/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sewickley Valley Medical Group &#8211; Cardiology</title>
		<link>http://shannon1.com/projects/sewickley-valley-medical-group-cardiology.php</link>
		<comments>http://shannon1.com/projects/sewickley-valley-medical-group-cardiology.php#comments</comments>
		<pubDate>Thu, 08 Oct 2009 18:14:10 +0000</pubDate>
		<dc:creator>Shannon Construction</dc:creator>
				<category><![CDATA[All Projects]]></category>
		<category><![CDATA[Healthcare]]></category>

		<guid isPermaLink="false">http://shannon1.com/beta/?p=477</guid>
		<description><![CDATA[The new space consisted of patient rooms with high grade medical cabinetry, doctor’s offices, and reception area. The scope of work required a nuclear camera room with strict design regulations.  As a result, the floor had to be reinforced with steel beams, concrete and a special epoxy floor. Due to the sensitive equipment, a temperature [...]]]></description>
			<content:encoded><![CDATA[<p>The new space consisted of patient rooms with high grade medical cabinetry, doctor’s offices, and reception area.</p>
<p>The scope of work required a nuclear camera room with strict design regulations.  As a result, the floor had to be reinforced with steel beams, concrete and a special epoxy floor. Due to the sensitive equipment, a temperature environmentally controlled system was integrated.</p>
<p>Exterior work consisted of new concrete sidewalk with an ADA ramp; reconfigure parking stalls on the side of the building, and new landscaping.</p>
]]></content:encoded>
			<wfw:commentRss>http://shannon1.com/projects/sewickley-valley-medical-group-cardiology.php/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Target</title>
		<link>http://shannon1.com/projects/target.php</link>
		<comments>http://shannon1.com/projects/target.php#comments</comments>
		<pubDate>Thu, 08 Oct 2009 18:13:21 +0000</pubDate>
		<dc:creator>Shannon Construction</dc:creator>
				<category><![CDATA[All Projects]]></category>
		<category><![CDATA[Development]]></category>

		<guid isPermaLink="false">http://shannon1.com/beta/?p=451</guid>
		<description><![CDATA[Shannon Construction worked closely with the Michael Baker Engineering, JJ Gumberg Co and Target’s general contractor to prepare the site for the new building. We were responsible for the demolition of all the existing structures on site of the development area. Shannon Construction supervised all of the site excavation, grading, drainage, foundation and slab on [...]]]></description>
			<content:encoded><![CDATA[<p>Shannon Construction worked closely with the Michael Baker Engineering, JJ Gumberg Co and Target’s general contractor to prepare the site for the new building.</p>
<p>We were responsible for the demolition of all the existing structures on site of the development area. Shannon Construction supervised all of the site excavation, grading, drainage, foundation and slab on grade. We setup of all temporary utility accounts for Target site and the generators on site.</p>
<p>The final phase of construction included installation of concrete sidewalks, curbs, asphalt paving, and landscaping.</p>
<p><br class="spacer_" /></p>
<p><br class="spacer_" /></p>
]]></content:encoded>
			<wfw:commentRss>http://shannon1.com/projects/target.php/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Fridays</title>
		<link>http://shannon1.com/projects/fridays.php</link>
		<comments>http://shannon1.com/projects/fridays.php#comments</comments>
		<pubDate>Thu, 08 Oct 2009 18:12:04 +0000</pubDate>
		<dc:creator>Shannon Construction</dc:creator>
				<category><![CDATA[All Projects]]></category>
		<category><![CDATA[Hospitality]]></category>

		<guid isPermaLink="false">http://shannon1.com/beta/?p=515</guid>
		<description><![CDATA[Shannon Construction Company was contracted to relocate the existing bar from the rear of the restaurant to the front, without interrupting business.  This task was achieved by having a phased schedule and running two shifts. All new mechanicals had to tie in with the existing as well as new finishes. New ceiling had to be [...]]]></description>
			<content:encoded><![CDATA[<p>Shannon Construction Company was contracted to relocate the existing bar from the rear of the restaurant to the front, without interrupting business.  This task was achieved by having a phased schedule and running two shifts.</p>
<p>All new mechanicals had to tie in with the existing as well as new finishes.</p>
<p>New ceiling had to be consistent with the existing ceiling lines at the restaurant ceiling area.</p>
<p>A tincraft ceiling was installed at the bar area and custom wood  with cabinetry was designed and installed. All new light fixtures were installed to enhance the dining experience.</p>
]]></content:encoded>
			<wfw:commentRss>http://shannon1.com/projects/fridays.php/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Upper Crust</title>
		<link>http://shannon1.com/projects/upper-crust.php</link>
		<comments>http://shannon1.com/projects/upper-crust.php#comments</comments>
		<pubDate>Thu, 08 Oct 2009 13:51:12 +0000</pubDate>
		<dc:creator>Shannon Construction</dc:creator>
				<category><![CDATA[All Projects]]></category>
		<category><![CDATA[Hospitality]]></category>

		<guid isPermaLink="false">http://shannon1.com/beta/?p=518</guid>
		<description><![CDATA[Upper Crust premiered the first United States location at the Pittsburgh International Airport’s Air Mall.  Shannon Construction Co, was awarded the 900 sq. ft. build-out of the French bakery. The space has a European flair which consisted of: Curved bulk heads Custom built wood panels Ceramic floor Stainless steel cabinetry Decorative lighting was installed to [...]]]></description>
			<content:encoded><![CDATA[<p>Upper Crust premiered the first United States location at the Pittsburgh International Airport’s Air Mall.  Shannon Construction Co, was awarded the 900 sq. ft. build-out of the French bakery.</p>
<p>The space has a European flair which consisted of:</p>
<ul>
<li>Curved bulk heads </li>
<li>Custom built wood panels</li>
<li>Ceramic floor</li>
<li>Stainless steel cabinetry</li>
<li>Decorative lighting was installed to illuminated restaurant with warmth and richness</li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://shannon1.com/projects/upper-crust.php/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Completed Restaurant Projects</title>
		<link>http://shannon1.com/projects/completed-restaraunt-projects.php</link>
		<comments>http://shannon1.com/projects/completed-restaraunt-projects.php#comments</comments>
		<pubDate>Thu, 08 Oct 2009 13:50:08 +0000</pubDate>
		<dc:creator>Shannon Construction</dc:creator>
				<category><![CDATA[All Projects]]></category>
		<category><![CDATA[Hospitality]]></category>

		<guid isPermaLink="false">http://shannon1.com/beta/?p=521</guid>
		<description><![CDATA[City of Bridges Pittsburgh International Airport   AU Bon Pain Pittsburgh International Airport   Mayorga Coffee Pittsburgh International Airport   The Colony Mt. Lebanon PA   Hi Tops North Side, PA]]></description>
			<content:encoded><![CDATA[<p align="center"><strong><span style="color: #0000ff;"><span style="font-size: large;">City of Bridges</span></span></strong></p>
<p align="center">Pittsburgh International Airport</p>
<p align="center"> </p>
<p align="center"><strong><span style="color: #0000ff;"><span style="font-size: large;">AU Bon Pain</span></span></strong><strong> </strong></p>
<p align="center">Pittsburgh International Airport</p>
<p align="center"> </p>
<p align="center"><strong><span style="color: #0000ff;"><span style="font-size: large;">Mayorga Coffee</span></span></strong></p>
<p align="center">Pittsburgh International Airport</p>
<p align="center"> </p>
<p align="center"><strong><span style="color: #0000ff;"><span style="font-size: large;">The Colony</span></span></strong></p>
<p align="center">Mt. Lebanon PA</p>
<p align="center"> </p>
<p align="center"><strong><span style="color: #0000ff;"><span style="font-size: large;">Hi Tops</span></span></strong><strong> </strong></p>
<p align="center">North Side, PA</p>
]]></content:encoded>
			<wfw:commentRss>http://shannon1.com/projects/completed-restaraunt-projects.php/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Completed Financial Projects</title>
		<link>http://shannon1.com/projects/completed-financial-projects.php</link>
		<comments>http://shannon1.com/projects/completed-financial-projects.php#comments</comments>
		<pubDate>Thu, 08 Oct 2009 13:49:26 +0000</pubDate>
		<dc:creator>Shannon Construction</dc:creator>
				<category><![CDATA[All Projects]]></category>
		<category><![CDATA[Financial]]></category>

		<guid isPermaLink="false">http://shannon1.com/beta/?p=491</guid>
		<description><![CDATA[  Federal Home Loan Building Pittsburgh, PA   Symons Capital Management Mt. Lebanon, PA   McMahon Financial Mt. Lebanon, PA]]></description>
			<content:encoded><![CDATA[<p align="center"> </p>
<p align="center"><span style="font-size: large;"><span style="color: #0000ff;">Federal Home Loan Building</span></span></p>
<p align="center">Pittsburgh, PA</p>
<p align="center"> </p>
<p align="center"><span style="color: #0000ff;"><span style="font-size: large;">Symons Capital Management</span></span></p>
<p align="center">Mt. Lebanon, PA</p>
<p align="center"> </p>
<p align="center"><span style="color: #0000ff;"><span style="font-size: large;">McMahon Financial</span></span></p>
<p align="center">Mt. Lebanon, PA</p>
]]></content:encoded>
			<wfw:commentRss>http://shannon1.com/projects/completed-financial-projects.php/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Completed Office Projects</title>
		<link>http://shannon1.com/projects/completed-office-projects.php</link>
		<comments>http://shannon1.com/projects/completed-office-projects.php#comments</comments>
		<pubDate>Thu, 08 Oct 2009 13:48:38 +0000</pubDate>
		<dc:creator>Shannon Construction</dc:creator>
				<category><![CDATA[All Projects]]></category>
		<category><![CDATA[Office]]></category>

		<guid isPermaLink="false">http://shannon1.com/beta/?p=509</guid>
		<description><![CDATA[Allied Insurance Pittsburgh, PA   JJ Gumberg Co. Pittsburgh, PA   US Bank Pittsburgh, PA]]></description>
			<content:encoded><![CDATA[<p><br class="spacer_" /></p>
<p align="center"><span style="font-size: large;"><span style="color: #0000ff;">Allied Insurance</span></span></p>
<p align="center">Pittsburgh, PA</p>
<p align="center"> </p>
<p align="center"><span style="font-size: large;"><span style="color: #0000ff;">JJ Gumberg Co.</span></span></p>
<p style="text-align: center;">Pittsburgh, PA</p>
<p style="text-align: center;"> </p>
<p align="center"><strong><span style="color: #0000ff;"><span style="font-size: large;">US Bank</span></span></strong></p>
<p align="center">Pittsburgh, PA</p>
]]></content:encoded>
			<wfw:commentRss>http://shannon1.com/projects/completed-office-projects.php/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Completed Healthcare Projects</title>
		<link>http://shannon1.com/projects/completed-healthcare-projects.php</link>
		<comments>http://shannon1.com/projects/completed-healthcare-projects.php#comments</comments>
		<pubDate>Thu, 08 Oct 2009 13:47:47 +0000</pubDate>
		<dc:creator>Shannon Construction</dc:creator>
				<category><![CDATA[All Projects]]></category>
		<category><![CDATA[Healthcare]]></category>

		<guid isPermaLink="false">http://shannon1.com/beta/?p=498</guid>
		<description><![CDATA[Asbury Heights Mt. Lebanon, PA   XpresSpa Pittsburgh International Airport   Pediatric Alliance]]></description>
			<content:encoded><![CDATA[<p><br class="spacer_" /></p>
<p align="center"><span style="font-size: large;"><span style="color: #0000ff;">Asbury Heights</span></span><strong> </strong></p>
<p align="center">Mt. Lebanon, PA</p>
<p align="center"> </p>
<p align="center"><span style="color: #0000ff;"><span style="font-size: large;">XpresSpa</span></span></p>
<p align="center">Pittsburgh International Airport</p>
<p align="center"> </p>
<p align="center"><span style="color: #0000ff;"><span style="font-size: large;">Pediatric Alliance </span></span></p>
]]></content:encoded>
			<wfw:commentRss>http://shannon1.com/projects/completed-healthcare-projects.php/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Completed Development Projects</title>
		<link>http://shannon1.com/projects/completed-development-projects.php</link>
		<comments>http://shannon1.com/projects/completed-development-projects.php#comments</comments>
		<pubDate>Thu, 08 Oct 2009 13:47:00 +0000</pubDate>
		<dc:creator>Shannon Construction</dc:creator>
				<category><![CDATA[All Projects]]></category>
		<category><![CDATA[Development]]></category>

		<guid isPermaLink="false">http://shannon1.com/beta/?p=479</guid>
		<description><![CDATA[  Burlington Coat Factory North Hills, PA  The 1$M+ Adaptive reuse of an existing 75,000 sf strip maill box was completed using a design collaboration approach to reduce the time frame to four months. Best Buy West Mifflin, PA This complete renovation of a grocery store into a Best Buy included; all new utilities, facade [...]]]></description>
			<content:encoded><![CDATA[<p><span style="color: #0000ff;"> </span><br class="spacer_" /></p>
<p align="center"><span style="font-size: large; color: #0000ff;">Burlington Coat Factory</span></p>
<p align="center">North Hills, PA</p>
<p align="center"> The 1$M+ Adaptive reuse of an existing 75,000 sf strip maill box was completed using a design collaboration approach to reduce the time frame to four months.</p>
<p align="center"><span style="font-size: large;"><span style="color: #0000ff;">Best Buy</span></span></p>
<p align="center">West Mifflin, PA</p>
<p align="center">This complete renovation of a grocery store into a Best Buy included; all new utilities, facade and roof. This project was compelted in 53 calendar days.</p>
<p align="center"> </p>
<p align="center"><span style="font-size: large;"><span style="color: #0000ff;">BEST BUY</span></span></p>
<p align="center">Bethel Park, PA</p>
<p align="center">The ground up development included raising the site by 40 feet and was part of an $8m development managed by Shannon Construction Co.</p>
]]></content:encoded>
			<wfw:commentRss>http://shannon1.com/projects/completed-development-projects.php/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

