When Shannon Construction returned to Tobii Dynavox shortly after completing the original headquarters renovation in February 2026, the team already knew the facility, building systems, and client’s operational preferences. Relationships established during the first project with Tobii Dynavox, NEXT Architecture, the engineers, and Turner & Townsend were also instrumental for seamless execution.
Navigating Existing Building Systems
The original renovation involved many electrical and mechanical upgrades, structural modifications, and specialized equipment installations. Several of the same subcontractors were brought back for the expansion project, with firsthand knowledge of the building, how to complete a successful installation into existing features, and site expectations.
That experience provided context when planning the new scope, and removed many unknowns. At the loading dock, Shannon and NEXT Architecture evaluated an alternative arrangement of overhead and personnel doors to avoid a structural conflict, taking into account the access and day-to-day needs previously learned from Tobii Dynavox.
Leveraging Previous Solutions
During the original renovation, fumes from a specialized laser engraving and cutting device prompted the project team to redesign the exhaust. Shannon worked with the engineers and mechanical subcontractor to find an effective solution.
In the expansion project, similar equipment was also in scope of installation. Shannon Project Manager, Tammy Chiesa, explained that the team was able to adapt the previous exhaust solution to the new equipment, saving time and design iterations, and avoiding another fume issue.
Project Team Continuity
Shannon Superintendent Brian Schussler, and several subcontractors, were requested to return for the expansion, continuing to build on their past work with the collective group. During discussions for installing the new scope, drawing on the field team’s hands-on experience enabled quicker decisions.
With construction extending into occupied areas, Brian coordinated temporary barricades, warehouse deliveries, and work schedules to limit disruption to the client’s daily activities.
From facility knowledge, to operational expectations and team communication, a consistent project team proved invaluable in executing the second round for Tobii Dynavox and simplifying the process.